Sprinkling layer of the primer (ARS 1700) on asphalt or concrete.Laying out the base layer which consist of mixed black SBR granules (1-4 mm) with Polyurethane (ARS 13260) to achieve total thickness of 11 mm. Laying out one layer of Polyurethane pore sealer (ARS 1222) to fill the pores with red EPDM (0.0 - 0.5 mm).Laying out one layer of coating consisting mixed of Polyurethane (ARS ) bended with EPDM powder along with the red EPDM (0.0 – 0.5 mm) to achieve total thickness of 2 mm.Laying out the final layer of the sealer (Polyurethane – ARS 64 HE)